Project Description | Construction of New Line between New Modasa (MDSA) at take off point at Km :99.00 (from Nadiad) Chainage Ch.:0.00 m to Shamlaji Road (SJS) at Ch.:26595.40 m (26.595 km) covering all Civil Engineering works (i.e. Earthwork, Blanketing, Side Drains, Retaining Wall, Construction of Important Bridge, all Major / Minor Bridges, RUBs / LHS, Level Crossings, Complete Track works, Ballast Supply and Other Civil Engineering works) of Vadodara Division on Western Railway |
Type | Railway |
Length | 32.49 Km |
Client | Western Railway |
Scope of Work | Construction of New Line between New Modasa (MDSA) at take off point at Km :99.00 (from Nadiad) Chainage Ch.:0.00 m to Shamlaji Road (SJS) at Ch.:26595.40 m (26.595 km) covering all Civil Engineering works (i.e. Earthwork, Blanketing, Side Drains, Retaining Wall, Construction of Important Bridge, all Major / Minor Bridges, RUBs / LHS, Level Crossings, Complete Track works, Ballast Supply and Other Civil Engineering works) of Vadodara Division on Western Railway |
No. of Lanes | |
Total Lane Kilometers | 0.00 Km |
Category of Road | |
Estimated Project Cost (Rs.) | 192.87 Crores |
Completion Period | 2 Years |
Maintance Period |
Business inquiry: [email protected]
Railway Projects
- Home
- Railway Projects
CALL US NOW
Business inquiry: +919625496506 Corporate Office
MKC House Plot No-132,T.P. No.9 K.H.-Road, Near Radiant School Gandhinagar, Gujarat SEND US A MESSAGE
Business inquiry: [email protected] MKC involve in almost the entire spectrum of Infrastructure activities in India and specifically in India’s most Development Zone Gujarat.
MKC NEWSLETTER
© 2024 MKC Infrastructure Ltd. All Rights Reserved.