Development of Ujjain-Jaora Greenfield Highway including Ujjain spur connectivity as 4-Lane with Paved Shoulder (Design length - 98.73 km) in the State of Madhya Pradesh on Hybrid Annuity Mode.

Madhya Pradesh Road Development Corporation represented by the Managing Director, M P Road Development Corporation (the “Authority”) is engaged in the development of State Highways. The MPRDC is a State Highway Authority. The Authority has decided to the development, maintenance and management of Development of Ujjain-Jaora Greenfield Highway including Ujjain spur connectivity as 4-Lane with Paved Shoulder (Design length – 98.73 km) in the State of Madhya Pradesh on Hybrid Annuity Mode (HAM).

PROJECT AT GLANCE

Bid Project Cost:

2080 Cr.

Project Start Date:

16.07.2026

Project Execution Period:

2 Years

Operation & Maintenance:

15 Years

Length of the Project Highway:

98.73 Km

Client:

Madhya Pradesh Road Development Corporation Limited

Concessionaire:

Ujjain-Jaora Mahakaleshwar Highways Private Limited

Independent Engineer:

Intercontinental Consultants and Technocrats Pvt. Ltd.

Lenders:

Indian Bank & Bank of India

Lenders Independent Engineer:

Goldrush Capital Services Pvt. Ltd.

PROPOSAL FOR IMPROVED CONNECTIVITY

The Ujjain–Jaora Greenfield Highway is proposed to enhance regional connectivity by providing a high-speed, access-controlled corridor between Ujjain, Jaora, and adjoining districts. The project will reduce travel time, improve road safety, ease traffic congestion on existing highways, facilitate faster movement of goods and passengers, and promote economic growth, tourism, and industrial development in Madhya Pradesh.

PROJECT TIMELINE

  • 27.12.2025 Letter of Award
  • 30.04.2026 Agreement
  • Awaited. Financial Closure
  • 16.07.2026 Appointed Date
  • 730 days from AD
  • Schedule Completion Date
  • (15 Years) O & M Period

Existing Project Site

The Site of the project corridor starts from Km 38+150 of NH752D (Ujjain-Badnawar Road) (Latitude 23°9’36.48″N & Longitude 75°42’37.90″E) and terminates at KM 133.930 of Mhow-lebad-Jaora Neemach-Nayagaon road SH-52 (Latitude 23°40’1.23″N & Longitude 75° 7’19.83″E) (Design Length 88.050 Km). The project scope additionally includes Construction of 4 lane road for Ujjain Spur connectivity (Length 10.68Km). An Index Map and location Map of the Project highway is given as below:

MONTHLY PROGRESS REPORT

No. Month Remarks
1 Oct-26