Development of Ujjain-Jaora Greenfield Highway including Ujjain spur connectivity as 4-Lane with Paved Shoulder (Design length - 98.73 km) in the State of Madhya Pradesh on Hybrid Annuity Mode.

Madhya Pradesh Road Development Corporation represented by the Managing Director, M P Road Development Corporation (the “Authority”) is engaged in the development of State Highways. The MPRDC is a State Highway Authority. The Authority has decided to the development, maintenance and management of Development of Ujjain-Jaora Greenfield Highway including Ujjain spur connectivity as 4-Lane with Paved Shoulder (Design length – 98.73 km) in the State of Madhya Pradesh on Hybrid Annuity Mode (HAM).
PROJECT AT GLANCE
Bid Project Cost: |
2080 Cr. |
Project Start Date: |
16.07.2026 |
Project Execution Period: |
2 Years |
Operation & Maintenance: |
15 Years |
Length of the Project Highway: |
98.73 Km |
Client: |
Madhya Pradesh Road Development Corporation Limited |
Concessionaire: |
Ujjain-Jaora Mahakaleshwar Highways Private Limited |
Independent Engineer: |
Intercontinental Consultants and Technocrats Pvt. Ltd. |
Lenders: |
Indian Bank & Bank of India |
Lenders Independent Engineer: |
Goldrush Capital Services Pvt. Ltd. |
PROPOSAL FOR IMPROVED CONNECTIVITY
The Ujjain–Jaora Greenfield Highway is proposed to enhance regional connectivity by providing a high-speed, access-controlled corridor between Ujjain, Jaora, and adjoining districts. The project will reduce travel time, improve road safety, ease traffic congestion on existing highways, facilitate faster movement of goods and passengers, and promote economic growth, tourism, and industrial development in Madhya Pradesh.
PROJECT TIMELINE
- 27.12.2025 Letter of Award
- 30.04.2026 Agreement
- Awaited. Financial Closure
- 16.07.2026 Appointed Date
- 730 days from AD
- Schedule Completion Date
- (15 Years) O & M Period
Existing Project Site
The Site of the project corridor starts from Km 38+150 of NH752D (Ujjain-Badnawar Road) (Latitude 23°9’36.48″N & Longitude 75°42’37.90″E) and terminates at KM 133.930 of Mhow-lebad-Jaora Neemach-Nayagaon road SH-52 (Latitude 23°40’1.23″N & Longitude 75° 7’19.83″E) (Design Length 88.050 Km). The project scope additionally includes Construction of 4 lane road for Ujjain Spur connectivity (Length 10.68Km). An Index Map and location Map of the Project highway is given as below:



